Featured Image of Prestige Park Street Completion Date

Prestige Park Street's completion date is October 31, 2030, giving homebuyers their keys exactly four years after site building starts on October 25, 2026. Built by Prestige Group, this community sits on 3.48 acres of land and holds 252 homes across 4 residential towers. Each building has two basement floors for parking, a ground level, and 18 residential floors.

The site keeps daily life quiet by placing only 72 homes on each acre. You can pick from 3 BHK flats starting at 2,280 sq ft up to large 4.5 BHK flats that measure 4,288 sq ft.

Starting prices begin at ₹4 Crores, which works out to about ₹17,500 per sq ft before the official launch on October 5, 2026. The builder is currently filing papers with local housing authorities so that all legal approvals are in place before workers dig the first trench.

Project Key Highlights:

Milestone DetailOfficial Project Data
Public Launch DayOctober 05, 2026
Groundwork Start DayOctober 25, 2026
Building Finished TargetOctober 25, 2030
Final Key Handover DayOctober 31, 2030
Total Project Land Area3.48 Acres
Number of Towers & Floors4 Towers (2 Basements + Ground + 18 Floors)
Total Flats on Site252 Units
Starting Size & Base Cost2,280 sq ft | ₹4.00 Cr onwards
Legal Filing RecordState RERA in Process

RERA Registered Completion Timelines vs Target Possession Dates

The official RERA end date gives the builder an extra 6 to 12 months after their October 31, 2030 promise. The government adds this grace period so that sudden heavy rains, street work, or slow water pipe hookups do not land the project in legal trouble.

Stage of WorkTarget DateWhat Happens On-Site
Project Launch DayOctober 05, 2026Flat booking opens and pricing sheets are shared
Digging & ShoringOctober 25, 2026Heavy machines clear soil and build boundary walls
Main Building Work EndsOctober 25, 2030All concrete roofs are cast and walls are built
Flat Keys Given to BuyersOctober 31, 2030Families get their door keys and move-in letters
Government Safety BufferMid 2031Extra legal time to close all government files

You sign a sale agreement that links every payment directly to real work done on-site, not simple calendar months. If the builder misses the promised deadline, Section 18 of the RERA law forces them to pay you monthly cash interest until they hand over your keys.

Year-Wise Construction Phases from Groundbreaking to Handover (2026–2030)

Foundation work is expected to start on October 25, 2026. The project is planned over about 48 months. Modern construction methods will be used to build the towers and concrete walls.

  • Phase 1: Digging & Base Work (October 2026 – June 2027): Workers dig out two basement parking levels and pour the heavy concrete base.
  • Phase 2: Building Up the Towers (July 2027 – December 2028): Cranes put up the ground floor and all 18 upper floors across the four towers.
  • Phase 3: Pipes, Wires & Glass (January 2029 – September 2029): Teams run the water lines, lay power cables, fit fire pipes, set up lifts, and fix the windows.
  • Phase 4: Tiles, Paint & Green Yards (October 2029 – July 2030): Crews lay the floor tiles, paint inside walls, finish switchboards, and plant garden lawns.
  • Phase 5: Safety Tests & Getting Your Keys (August 2030 – October 31, 2030): City inspectors test water and power lines before the builder hands over the front-door keys.

Construction-Linked Payment (CLP) Schedule Tied to Completion Dates

The construction-linked payment plan splits the total cost into 10 stages. Buyers make each payment as the work moves forward. Each payment is linked to a clear stage of construction, so it is easier to track the progress and plan your budget.

Step NumberBuilding Step Done on SitePayment Due (%)Total Paid (%)
Step 01Booking Token & Booking Form10%10%
Step 02Signing Agreement of Sale (AOS)10%20%
Step 03Basement Foundation Slab Finished10%30%
Step 044th Floor Concrete Roof Slab Done10%40%
Step 0510th Floor Concrete Roof Slab Done10%50%
Step 06Top 18th Floor Roof Slab Done10%60%
Step 07Brick Walls and Plaster Done10%70%
Step 08Floor Tiles and Bathroom Tiles Laid15%85%
Step 09Lift Working and Outside Paint Done10%95%
Step 10Occupancy Certificate & Final Keys05%100%

Because payments depend on actual site work, your bank keeps your monthly interest small during the first two years of building.

Handover Documentation: Occupancy Certificate (OC) vs Completion Certificate (CC)

A Completion Certificate (CC) confirms that the building matches the approved plans. An Occupancy Certificate (OC) confirms that the building is ready and safe for people to live in. Buyers should wait for the official OC before moving in or making major interior changes. It may also be needed to get an individual electricity connection.

  • Completion Certificate (CC): City building officers hand this over after checking building height, fire truck driveways, and outer boundary open spaces.
  • Occupancy Certificate (OC): Water and fire departments hand this over after testing drinking water pipes, working fire hoses, and clean waste systems.
  • Fire & Pollution NOCs: Official passes from state fire squads and air quality boards confirming the building passes state safety checks.
  • Possession Letter: A signed company letter giving you personal ownership of the flat and your marked basement car parking slots.
  • Sale Deed Registration: The final government visit to the sub-registrar office to put your name on the government land records as the full owner.

Factors Influencing the 2030 Delivery Schedule and Delay Safeguards

Prestige Group plans materials and construction work to help keep the project on schedule. Large projects also use steps to manage delays caused by weather or other issues.

  • Rainwater Control: Pumps and drainage systems help remove rainwater from the site during heavy rains.
  • Early Material Orders: Steel, cement, and other key materials can be ordered early to help avoid supply delays.
  • Early Approvals: Building documents can be submitted in advance so required fire, power, and other checks can be completed on time.
  • Project Bank Account: Under RERA rules, 70% of the money collected from buyers is kept in a separate bank account for the project, as required by law.

FAQs

The official structural completion date is October 25, 2030, and homeowners start getting their keys on October 31, 2030. Work on site begins on October 25, 2026, shortly after the public launch on October 5, 2026.

The project has 4 residential towers rising across two basement levels, a ground floor, and 18 upper floors on 3.48 acres. In total, the project holds 252 homes with 72 flats on each acre of land.

Heavy ground digging and foundation work start on October 25, 2026. Workers clear weeds, set up site gates, and steady boundary soil right before this date.

Under Section 18 of RERA law, the builder must pay you interest every month at the state bank lending rate plus 2% until you get your flat. You also have the legal right to ask for a full refund of your money with added interest.

You cannot start interior work until the city checks the property and gives an Occupancy Certificate (OC). Moving materials into a flat without an OC breaks city laws and leaves you without permanent power or tap water.